S-IL-082-500-07-W Ultra-high pressure food processing experimental machine
1.Chamber diameter: Ø82 mm1
2.Inner diameter of product basket in cavity: Ø77 mm1
3.Length of chamber: 500 mm1
4.Length of product basket in cavity: 450 mm1
5.Total volume available in the chamber: 2 L(2.6L excluding product basket volume)
6.Working fluid: Water 2
7.Maximum working pressure: 700 MPa
8.High pressure cavity structure: closed/composite structure cavity with both ends locked
9.Operating temperature range: 4°C +90°C
10.Locking device: hydraulic system assisted operation
11.Pre-booster system: 70 MPa pre-booster pump
12.High pressure system: Supercharger, model 085/20
13.Pressurization time: 300s can be pressurized to 700 MPa
14.Charging time is adjustable: from 300s to 1500s
15.Pressure holding time: 0.1 seconds to 999 minutes
16.Decompression system: 2 stages, fully automatic
17.Pressure measurement: strain type pressure sensor
18.Pressure display/control: digital display, electronic control
19.Temperature measurement: Type 'T' thermocouple
20.Temperature probe position: fixed on the head of the high pressure cavity plug
21.Temperature display: digital display temperature error ±2°C
22.Decompression time: adjustable from 30s to 2000s
23.Product storage basket: Included
24.Heating system: Not included, a heater can be fitted to heat the system from ambient temperature to 99 ° C
25.Cooling system (optional) : Not included, optional, to cool the system to 4 ° C
26.Control logic: PLC connected to PC control
27.Floor area: 1.8m (L) x 1.5m (W) x 1.8m (H)
28.System weight: 1500Kg
29.Power consumption: 3 kW
30.Power supply: 400V 50Hz 3ph neutral ground wire
31.Compressed air: 5 barg (min) 50 Nl/cycle
32.Test: Perform stress test as required and test in accordance with functional performance system test specifications
33.Documents: test certificate, CE certificate, 1) Operation manual; 2) Maintenance instructions; 3) Final assembly drawing; 4) Spare parts list
34.Training, operation, maintenance and other training is carried out during the trial operation and installation